City of Pateros, WA

Location: Pateros, WA

Apollo Solutions Group (ASG) worked with the City of Pateros staff with review and approval from the state of Washington Department of Enterprise Services to develop this Energy Savings Performance Contract.

Like many government buildings, Pateros’ structures were outdated and included aging infrastructure. Lighting, well pumps and heat
pump HVAC systems were upgraded, resulting in 12% annual reduction in energy usage. The energy project allows for increased comfort and reliability of systems as well as positive cash flow throughout life of project.
 

File Downloads:

 Slideshow Image
 Slideshow Image
 Slideshow Image
 Slideshow Image
Relevant Project Details:
  • Utilization of $500,000 grant from State of Washington Department of Commerce
  • Utilization of $6,403 from Okanogan County PUD in Rebates and Incentives
  • Citywide lighting upgrade including pathway lights and tennis courts
  • Municipal well pump replacements
  • Wastewater pump replacements
  • New library heat pump HVAC system
  • Addition of the city hall entry weather vestibule
  • Improved comfort and improved reliability of systems
  • Positive cash flow throughout the life of the project
  • Select Infrastructure Renewal
  • Select Life Cycle Improvement

© Copyright 2023. All rights reserved.
Apollo Solutions Group